2018: Hobby Room Renovation, Part 1
1
October 23, 2024Fortunately, while I'm no good at construction, I'm REALLY good at demolition! I can wield a sledge hammer and crow bar with the best of them. My main task in the reno was to rip out the old walls, de-nail, and save the lumber, and cut the old drywall into <16" widths. In BC, it now costs money to send drywall to the dump, so a common practice is to bury the old drywall behind the new drywall. More insulation, and passes the problem off to the next house owner, when they decide to renovate!2
October 23, 20243
October 23, 20244
October 23, 20245
October 23, 20246
October 23, 20247
October 23, 20248
October 23, 2024The reason for all this lumber, even though the studs are still in place, was that the previous owners were a bit lazy. when they installed the rec room, they framed over the foundation, floor to ceiling, which narrowed the width and length of the room by a total of 8". We decided to frame to the inner edge of the foundation instead, so we were able to re-use all of the lumber from the previous framing job. Also, the floor was raised by 2" using 2x4s, so we re-used them as well. the new floor was laid directly on the concrete9
October 23, 202410
October 23, 202411
October 23, 2024Demolition complete. Time to start building. GORD!!!12
October 23, 202413
October 23, 202414
October 23, 202415
October 23, 202416
October 23, 202417
October 23, 202418
October 23, 202419
October 23, 2024It took me about a week to do the demoltion. Gord is a BEAST when it comes to construction. First wall has been framed. As you can see, we only brought the framing out to the edge of the foundation, rather than 4" beyond it. My 11'4" wide rec room became a 12'0" hobby room.20
October 23, 202421
October 23, 2024Back wall framed22
October 23, 2024Half of the other side wall framed. We had to step this one out 'cause of the chimney stack.23
October 23, 2024The other half done (almost). Had to step it out for the other chimney24
October 23, 202425
October 23, 202426
October 23, 202427
October 23, 202428
October 23, 202429
October 23, 202430
October 23, 202431
October 23, 202432
October 23, 202433
October 23, 202434
October 23, 202435
October 23, 202436
October 23, 2024Now Gord and his electrician son-in-law get to work on the electrical installation. We used extra circuits from our 200 Amp box to beef up the number of quad plug sockets. We went from ~10 wall plates (most only duplex) to ~30 quad wall plates. all installed at 40"😭I'm to old to be crawling on the floor looking for a socket to plug into)37
October 23, 2024Janet's end of the new hobby room. Her sewing machines and quilting/embroidery supplies will be here. I had the electricians connect the wall power to the light switch, so that she can turn everything off with one switch.38
October 23, 202439
October 23, 2024Ahhh, the drywall's arrived!40
October 23, 2024My end of the hobby room. I have SEVEN quad sockets, one on every stud (every 16"). This is the wall that my S.F. lighting projects will go on. Like Janet's end, these can be turned off by the light switch on my side of the hobby room.41
October 23, 202442
October 23, 202443
October 23, 202444
October 23, 2024Gord (L) and Rob (R), my 'electrcians'. Rob is a certified electrician; My friend. Gord, is his assistant.45
October 23, 202446
October 23, 202447
October 23, 202448
October 23, 202449
October 23, 2024To secure the drywall at the foundation level we ran 1x4 over the 2x4 framing that Gord put in. It gives us something for the drywall to screw into.50
October 23, 202451
October 23, 2024Now I had the (un)enviable task of disposing of the old drywall. All those chopped up pieces had to be fitted between the studs52
October 23, 2024Old drywall disposed of. Now Gord is installing the Fibreglas Pink insulation. Between the old drywall and insulation, I think we have about R1000 there!53
October 23, 202454
October 23, 202455
October 23, 202456
October 23, 2024Installing pot lighting electrical57
October 23, 202458
October 23, 202459
October 23, 202460
October 23, 202461
October 23, 202462
October 23, 202463
October 23, 2024Fiberglas and vapour barrier installed. Now it's time for me again. One thing I AM an expert in, is network cabling installation (from my former occupation as a network technical specialist). I installed and tested RJ-45 jacks (a total of 6) for my local area network (LAN), using CAT-7 cable (to support Gigabit ethernet speeds). Two are visible here, one each side of the window.64
October 23, 202465
October 23, 2024Another one on the outside wall. This is where my TV, network workgroup switch, and other network attached devices will live.66
October 23, 2024Two more RJ-45 ports at my end of the hobby room67
October 23, 2024Bury some more drywall (saved me $75 on sending to the recyclers).68
October 23, 202469
October 23, 2024Power installation finished on S.F. wall70
October 23, 2024Two more RJ-45 jacks on the outside wall at my end of the hobby room. Another jack (not shown) on the dividing wall, where I'll plug in another workgroup switch71
October 23, 2024Time for drywalling. We rented a drywall jack for a day to assist our installation of the ceiling drywall (show installed here). Gord has already started (with my assistance) to install the drywall on the walls.72
October 23, 202473
October 23, 2024My end of the hobby room. The RJ-45 plate (dangling) is actually a quad plate, so in all, there are 9RJ-45 Cat-7 connections in our hobby room. We also have wireless, but the Cat 7 wired network connection is much faster than the 5G wireless connection.74
October 23, 2024One of the RJ-45 receptacles installed. Just needs the cover to complete the connection. That will go on after painting.75
October 23, 2024Drywall installation complete.76
October 23, 202477
October 23, 2024Now the labourious task of mudding & sanding. Gord left much of that to me, to be done while he had gone home.78
October 23, 202479
October 23, 2024Had to put some fans in to dry the mud. It too a couple of days
80
October 23, 202481
October 23, 202482
October 23, 2024First coat of paint (white) applied83
October 23, 2024Second coat of white (ceiling84
October 23, 2024Pale yellow coat (walls)85
October 23, 202486
October 23, 2024Painting finished. Gord left me to install the wall plates. First I plugged the RJ-45 jacks into the back of the wall plates and snapped the plate in position87
October 23, 202488
October 23, 2024Six RJ-45 jacks connect to LAN wiring upstairs and other areas in the basement. Basement phone jack also here89
October 23, 202490
October 23, 2024All wall plates installed (Janet's end)91
October 23, 2024All wall plates installed, outside wall92
October 23, 2024All wall plates installed outside wall, Janet's end93
October 23, 2024Wall plates installed, interior wall Janet's end94
October 23, 2024Looking down new hobby room from Janet's end - that's a F**K of a lot of power!95
October 23, 202496
October 23, 2024Looking a Janet's end from my end. Note, she has a single light switch on her side of the door; I have FOUR. The bottom two control the pot lights. one for the outside rows of pots, the other for the middle row. Allows me to tailor the lighting for taking photos. The top two switches control the power. The left switch controls the interior wall power, and the right switch controls the outside wall power. I can turn off the lights in all my display cases with these two switches.97
October 23, 2024Time to install crown molding. I left that up to Gord (one of his areas of expertise) He left the painting to me.98
October 23, 2024Hobby room finished except for flooring, which arrived today. Installer is scheduled for tomorrow.99
October 23, 2024Installed came today, and finished it in one day.100
October 23, 2024Close up (Torlys vinyl flooring)101
October 23, 2024102
October 23, 2024103
October 23, 2024104
October 23, 2024Baseboard installed; taped, ready for grouting105
October 23, 2024106
October 23, 2024We'll call it done. Installer has to come back and install threshold in doorway. Elapsed renovation time: 1 week, demolition; 1 week for framing, & eletrical/network; 1 week drywall, mudding, sanding; 1 week painting, crown molding & baseboarding, 1 day floor installation. Total time ~4 weeks. We started each day around 8 AM and finished at 5 PM (I worked evenings as well) Total: 20 days @16 hrs = 320 hrs, call it 400 'cause I worked evenings painting, sanding etc, and we had 3 people (myself included) working on a couple of days. Labour cost: $1800 (for electrician); materials: (construction, electrical, paint, rentals: $3000.11; Floor (supplies and labour): $3459.25; total: $8259.36. Not a bad price for a complete renovation of a 12'x33' room! Lots of sweat equity spent, tho.107
October 23, 2024108
October 23, 2024109
October 23, 2024Now, all the 'stuff' has to be put back! Janet's end.110
October 23, 2024My end.111
October 23, 2024112
October 23, 2024113
October 23, 2024A couple of new IKEA tables to replace the old office desk.114
October 23, 2024115
October 23, 2024My new power wall. I can now turn 7 quad outlets into power for 42 projects! Nice thing is - all of the projects are using LED's which are drawing in the order of 50-100 mA, and there's no other receptacles on this circuit, so I'm in no danger of exceeding 15A.116
October 23, 2024Janet's half of the new hobby room.117
October 23, 2024The 'entertainment' centre. Still lots of junk to get rid of (including the sofa bed)118
October 23, 2024My end, tidied up. I opted for the 'T' arrangement of the IKEA tables (it didn't last)119
October 23, 2024Bookshelves put back. I had glass cut and installed it to keep the dust off the models.120
October 23, 2024View down the hobby room. The sofa bed acted as a room divider (until we got rid of it).121
October 23, 2024122
October 23, 2024123
October 23, 2024124
October 23, 2024Some of my collections. Stay tuned to part 2!