SR-71 Stand build
1September 23, 2020
Power socket removed and cable extended. It is glued in brass tube (8 mm.) with epoxy glue.
2September 26, 2020
Wooden box drilled in 8 mm. diameter for brass tube and on/off switch. Painted with spray can paint aluminium colour.
3October 1, 2020
Battery case and brass tube support fixed with epoxy glue.
4October 1, 2020
Brass tube primed with Vallejo and painted with Tamiya Flat black.
5October 1, 2020
Brass tube and on/off switch placed with epoxy glue. Wires attached.
6October 1, 2020
Brass tube positioned slightly backwards to achieve a nose up attitude.
Opmerkingen
1 23 September 2020, 15:16
Album info
Building process of scratch build stand of SR-71 project.
48 afbeeldingen

1:72
Voltooid
Lockheed M-12/D-21
US Air Force (1947-now)60-6940December 1964 - Groom Dry Lake
Alle albums
Bekijk alle albums »