The building and painting process.
Photo 1 of 33
Comentários
32 26 January 2023, 21:44

Zsolt, látom Te már túl vagy ezen a kiten. 🙂 Szép munka lett.
29 January 2023, 22:37

very nice job on this small BTR. And very nice base for the airbrush. i would suggest a small addition. two small horizontal pieces in the left arm, to sit at the sides of the valve, that would avoid the airbrush from rotating. then you can leave the airbrush in that nice base, fully loaded with paint, and not to worry about it spilling the paint accidentally.
you can also make a small hole in the left arm, but then the airbrush need to move forward and may have not much support in the right arm.
10 February 2023, 07:36

Hey Spanjaard! Thank you for the usefull feedback. I admit that I haven't used this setup yet, so you saved a floor cleaning action for me. 🙂)
10 February 2023, 09:30