albümler (10)
Tüm albümler
18 Görüntüler
B-29 Kee Bird
1:48
The cabin floor assy is in! All interior was painted with interior green.
proje: B-29 Kee Bird
13 Görüntüler
He 115 in Sweden, T-2
1:48
Never found on any drawings, these non-retractable steps were added below the oil cooler on the forward strut.
proje: He 115 in Sweden, T-2
17 Görüntüler
Dauphin in primer colors
1:48
Factory new, without call sign
proje: AS365 Zero Flight Hours