MCMV build progress
1
January 21, 20202
January 21, 2020The base has been prepared first using acrylic caulking, then white wall paint, and green and blue acrylic modeling paint3
January 21, 2020After fitting the hull into the base, it was masked and painted.4
January 21, 2020Some motivational fitting and checking of the base did take place.5
January 21, 2020The cranes needed supports after gluing.6
January 21, 2020This kit contains a number of white metal parts, I found working the material quite manageable.7
January 21, 2020There are decals for the bridge windows included in the kit, but I overlooked them and made my own masks. Duh.8
January 21, 2020I used wire strenghtening for the lower yardarms.9
January 21, 2020All the railing sections were pre-bent, test-fitted and then mounted for painting.10
January 21, 2020After removing the bridge window masks.11
January 21, 2020The base has received several coats of clear gloss.12
January 21, 2020The numerous equipment parts on the well deck need to be mounted prior to adding the next deck level. I should have painted the Oropesas differently, but they looked so nice in DayGlo Orange ...13
January 21, 2020The vessel is built, rigged, decaled and flat-coated - ready to be mounted on its base.14
January 21, 2020And from port ...
评论
1 21 January 2020, 20:06