Convair B-58A Hustler - build log
1
November 10, 2024Dry-fitted the beast to check out its size.... it's gonna be one massive addition to my collection 🙂2
November 10, 2024And it's also gonna need a massive nose weight to keep that nose grounded.3
November 10, 2024Main fuselage and wing assembly. Already mounted the gear doors, cause doing that after painting is going to be messy since they're moulded as one piece with the well sidewalls.4
November 10, 2024Collection sub assemblies5
November 10, 2024Made some metal plates in both of these and a small magnet in the belly of the Hustler so these tanks will be interchangeable 🙂6
November 16, 2024Trying out the nacelles to check how their seams are gonna work out, to further determine build order 🙂
It's like strapping two F-104's under each wing 😉7
November 24, 2024Started building the engines with all my add-on resin, here's the seamless intakes8
November 16, 2024A full dryfit of almost the complete kit. It is enormous... 🙂9
November 24, 2024All four of them, and the four exhaust nozzles10
November 24, 2024First of the nacelles assembled11
November 29, 2024Made a catch for that enormous pitot tube, so it'll be removable and nicely lined up12
November 29, 2024Retaining those raised panel lines was never an option really... :-/ By far the worst fit I've had on my bench so far ... #PuttyPuttyPutty13
November 29, 2024Undercarriage done 🙂14
December 8, 2024First of the nacelles rescribed... with a little F*-up on the pylon, but otherwise not bad. But OMFG what have I gotten my self into...15
December 14, 2024Putting this big boy on hold for the moment, getting a bit frustrated with the (lack of) progress with all this filling and sanding and more sanding and rescribing...
Komentáre
9 10 November 2024, 09:53
Project info
15 snímky
Convair B-58A Hustler

305 BW 61-2059 Greased Lightning
október 1963 Tokyo-London Flight
FS17038 NMF