时间线
Wall
February 24, 2025
February 23, 2025
February 22, 2025
February 17, 2025
February 15, 2025
February 3, 2025
January 28, 2025

拥有此物

Nuclear Powered Guided Missile Frigate
USS Bainbridge Branded Atlantis on sides Aurora 1:600
A717 2024 新的盒子 28 January, 02:28
January 10, 2025

添加了一个新相册
所有评论 (6) » 22 17 March 2022, 20:10
January 6, 2025

添加了一个新相册
63 图片
USS BATAAN (LHD-5)
1:700
160307: LHD-5 progress shot with airwing onboard. Aircraft are secured with a tiny drop of PVA glue on the main mounts.
所有评论 (11) » 40 19 January 2022, 23:22

Sorry if its a bit late to ask, are the stern gate's hydraulic operating arm an aftermarket product? because I can't find it in the sprues
6 January, 08:44

NotSensei: I confirmed the instructions do not show the option to have the stern ramp open so likely that no parts are provided. I's been a while, but I seem to remember I used simple Evergreen styrene sheet cut into square strips and trimmed to fit.
1 6 January, 18:18
December 23, 2024
December 15, 2024
November 14, 2024
November 7, 2024
November 6, 2024
October 31, 2024
October 7, 2024
October 3, 2024
October 2, 2024
September 20, 2024

添加了一个新相册
14 14 September 2024, 14:29
September 17, 2024
September 14, 2024
September 11, 2024

添加了一个新相册
4 11 September 2024, 20:10
September 1, 2024
August 31, 2024
August 28, 2024
August 22, 2024
August 19, 2024

添加了一个新相册
所有评论 (14) » 22 14 August 2024, 15:28

Sure: I sealed up the windows with Kapton tape (High-temp polyimide tape with silicon adhesive) and filled the windows with 2-Part Crystal Clear Casting resin, both fairly inexpensive on Amazon (about $10 each).
Here's another kit done the same way: T204 Project | Album by AndrexP (1:144)
2-part resin: amazon.com/gp/produc..le?ie=UTF8&psc=1
Kapton tape: amazon.com/gp/produc..le?ie=UTF8&psc=1
19 August 2024, 03:06
August 16, 2024

添加了一个新相册
13 13 August 2024, 15:08

Good job - as always from your bench. This particular work is inspiring, for refurbishing old desktop models 👍
16 August 2024, 20:01
August 15, 2024
August 13, 2024

完成了此项目

Boeing 757-200 US Airways Livery
Flight Miniatures 1:200
ABO-75720H-052 13 August 2024, 15:44

完成了此项目

Boeing 757-200 TWA/American Transition Livery
Flight Miniatures 1:200
LPxxx20 13 August 2024, 15:38
August 12, 2024
August 11, 2024
May 1, 2024
April 12, 2024
April 11, 2024
April 4, 2024
March 25, 2024
wnolder.php?lang=zh
2024-03-25 19:32:54
2013-11-04 20:37:24
14529
/ajax/wnolder.php?lang=zh&sd=2024-03-25 19:32:54&md=2013-11-04 20:37:24&filter=&w=14529
todo