DFW C.V (Gretel Lo)
コメント
1 10 January 2019, 03:12

Thanks guys. Added 3 more pics that show how I did the rigging.
10 January 2019, 11:38

Absolutely gorgeous build! I am stealing your wire length "calculator" idea 👍
9 March 2019, 14:04

Alec K: When I was cutting the first wire for the third time I was like - I need something better for this, because there is an awful lot of wires 😉 The only weakness is how to keep the damn thing in place while you glue the turnbuckles. The tape kind of works. May be masking fluid would work much better... need to try it next time...
10 March 2019, 00:26

I am assuming the turnbuckles are not actually eyelet-in-eyelet (that would be too easy...), and the ends must be cut to mate with the anchor eyelet? Hence the need to position them at appropriate angle?
10 March 2019, 13:29

They are Type A ([img1]?c=2) . It is one rigid piece. Then EZLine is threaded through the eyelet. So, yeah, you need to get the angle right. It is a tradeoff between building 30 of them vs. using a prefabricated part. Each has its own pluses and minuses.
10 March 2019, 18:05